Application for a variation to 3G licences (and consequent proposal to vary draft 2GHz MSS/CGC Base station licences) | Ofcom
Ofcom is holding a consultation on raising the power limits on 3G basestations which the mobile network operators(MNO) have requested in order to increase mobile coverage.
The MNOs have requested to increase the EIRP limit to 65dBm while Ofcom are suggesting 68dBm, the current limit is 62dBm EIRP i.e. an increase of 6dBm which is about 1585W going up to 3981W almost double the power.
Though Vodafone made the original request Ofcom are proposing that the limits be increased for all operators.
This will allow bigger cell sizes and therefore will be good for rural areas, though (if there any any) health risks will be increased too.
The consultation closes on 19/03/2010.
Download
Home / Unlabelled /
Application for a variation to 3G licences (and consequent proposal to vary draft 2GHz MSS/CGC Base station licences) | Ofcom
5 Şubat 2010 Cuma
Application for a variation to 3G licences (and consequent proposal to vary draft 2GHz MSS/CGC Base station licences) | Ofcom
Date -
10:28
Share this
Related Articles :
Kaydol:
Kayıt Yorumları
(
Atom
)
Recent Posts
Entri Populer
Label
Cloud Label
Fashion
(2)
Blog Arşivi
-
▼
2010
(212)
-
▼
Şubat
(24)
- KQED/KTEH Panel - Is Silicon Valley Going Green: I...
- Changes to our mobile lineup - Skype Blogs
- 144 petabytes in your pocket, or are you just plea...
- Berkeley Energy Symposium, March 3 and 4
- Fibre Capacity Limitations in Access Networks | Ofcom
- Twitter Blog: Measuring Tweets
- The Secret Ingredients Inside IBM’s New Solar Cell
- The Green Data Center Strategies of Web Giants
- Digital dividend: 600 MHz band and geographic inte...
- Star Trek Exhibition and Earth Message
- Seesaw tips the balance
- BlackBerry - BlackBerry Enterprise Server Express
- Top 10 Best Selling EnergyStar TVs
- Nokia and Intel to go Mee (or MeeGo)
- Innovate and get into the top 100
- DBVu goes live
- U.S. EPA and DOE Join Forces with States to Spur A...
- Application for a variation to 3G licences (and co...
- Facebook get's Hip and Hop
- Stanford Woods Institute and Bill Lane Center Unve...
- University of Michigan and Climate Savers Computin...
- Carphone Warehouse to split into TalkTalk and New ...
- There's a new play on words and it's called SeeSaw
- 2.6GHz Spectrum Auction delayed until 2011
-
▼
Şubat
(24)
0 yorum
Yorum Gönder